I did the cabling and it turns out one of the runs was bad and needed to be replaced. A hired a local tech to come uin and sort out the mess and he did.
1. Terminated my 3 phone extention lines directly to RJ11 plus and into the partner system bypassing the punch down patch panel I was...
TouchToneTommy -
So how did you terminate 6 wires on a 4-pair (8-conductor) jack and patch panel?
If I remember correctly there are 8 wires or 4 pairs in the cat5e cable that I used. Brown/brownwhite, Green/greenwhite, Blue/Bluewhite and Orange/Orangewhite.
I terminated the wires on the...
To Answer Dexman - 568B. The setup is boringly simple - 1 line, 3 phones in one room. The patch panel as it is in a secure room with 60 servers. Weird I know. I terminated each jack (all 6 wires at each jack and at the patch panel the same way. Confused how to move forward.
I installed my old partner 7.0 system this weekend at my office and thought I did everything right. Turns out I didn't because things aren't working at expected.
1. I used Hubbel HXJ5EB jacks at the wall and terminated to a 12 port (whatever you call with punchdown blocks on the back).
2. All...
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.