  1. EISS

    Importing from excel to MSP

    All, What would be the best way to import several contracts into MSP from excel? In other words for each contract I have about 99 lines of task. I have tried the following. Appending the project but then I have to change all the dependcies within Excel application for the contract. (Time...
  2. EISS

    Importing start date but project uses another date

    ID Name Duration Start Finish Predecessors Outline Level 1 C13282-5501 10/3/2006 0:00 1 2 MODS - EA dept. 10h 2 3 Metal Shop 12h 2 4 Inventory 15h 2 5 Shell 5h 3,4 2 6 paint 6h 5 2 7 Sub Assy 2h 2,3,4 2 8 Final 20h 7 2 9...
  3. EISS

    Importing start date but project uses another date

    All, I have been trying to import very basic information into Project 2003 std edition. The excel sheet has the Start date for the main Task (which is a contract) and assigned an outline level 1 as 30-sep. Under this task there are sub task with different durations assigned outline level 2. I...
  4. EISS

    Importing from Excel but need backward scheduling from finish date

    When importing from excel the only date I have used is for the main project under teh finish column. I tell Project to schedule from the finish date but it does not save that setting under the project information dialogue box. I beleive because of the wizard ignores it during the import. So to...