I have a backup server with a library attached. It has 2 backup drives and 25 mag slots.
The problem I have is that sheduled jobs will fail if a job is currently running, rather than sit an wait for it to finish as on other servers with a single backup drive.
Software is Arcserve 2000 and all patches have been loaded.
Is anyone able to help?
The problem I have is that sheduled jobs will fail if a job is currently running, rather than sit an wait for it to finish as on other servers with a single backup drive.
Software is Arcserve 2000 and all patches have been loaded.
Is anyone able to help?